Karbon Engineering Services provided commissioning services for the MEP/FP equipment that support the 11th floor offices, cafe, and trading floor. The total size of the 11th floor is 27,000-SF. The equipment included a 2N UPS system, 2N generator plant, and water cooled DX CRAC units from a dedicated closed loop fluid cooler system.